City Of Findlay Weekly Road Construction Update
(From the City of Findlay)
CONSTRUCTION 7/7-7/11:
-East St. will be closed to through traffic from E. Lincoln St. to E. Lima St. for curb replacement.
-Carnahan Ave. will be closed to through traffic from Tiffin Ave. to the Railroad for curb replacement.
-Allen Ave. will be closed to through traffic from Main St. to the Railroad for curb replacement.
-Midland Ave. will be closed to through traffic from Main St. to the Railroad for curb replacement.
-Garfield Ave. will be closed to through traffic from Main St. to the Railroad for curb replacement.
-Twp. Rd. 80 (Baseline Rd.) will be closed to all traffic from Springlake Drive (E.) to Springlake Dr. (W.) for a sanitary sewer project.
-Morrical Blvd. will be closed to through traffic from Logan Ave. to Bliss Ave. End for waterline installation.
-The Westbound lane of Howard St. will be close to all traffic from 7am-7pm from Broad Ave. to the Walmart entrance for construction of the Interstate Trail.
-N. Blanchard St. will be reduced to one lane in each direction from E. Melrose Ave. to Karen Ct. for curb replacement.
-Brookview Court will be closed to through traffic to from Brookside Dr. to the cul-de-sac for curb replacement.
-Foxfire Ln. will be closed to through traffic from Fox Run Rd. to the cul-de-sac for curb replacement.
Please contact the Engineering Department with any questions 419-424-7121.
